LINYI QUEEN IMP&EXP CO.,LTD.

Double Ledger

Double Ledger
Similar products
  • Intermediate Transom

    FeaturesThe range of Intermediate Transom offered by us provides a secure mid-bay support for scaffold boards.This intermediate transom strongly holds the ledgers in their jaw segment and avoids the c...

  • Base Collars

    The ring lock base collar is used with rosette and height-adjustable surface plated to build a scaffolding base.The initial section is placed in the base place, and then the vertical section is instal...

Queen Double Ledger ringlock scaffold are horizontal members of Ringlock scaffolding that allow for increased load carrying capacities not possible with single tube or regular duty ledgers. The Double ledger has been designed to enable higher service loads to be applied to the scaffold that could be applied to regular ledgers. They provide increased horizontal support for loads and planks. The reinforcing tube and stiffener plates support the top tube and provide strength while maintaining lightness. Moreover, the Double Ledger is designed to support scaffold decks when large bay areas are required. Alternatively, they support scaffold when spanning obstructions. Queen Group will give you a perfect product, along with fast and knowledgeable service. You will know where to look for any other scaffolding or accessories that you might be in need in the future.

Features of Double Ledger

Length: 2.44 meters or 96 inches
This Ring Lock Scaffolding Horizontal ledger is 8 feet in length. A true imperial dimension of 8 feet. Compatible with Layher, DSS, All Around, Pin Lock and more...

1. Compatible with All Around Scaffolding Systems
2. This is the most compatible design in the Pin Lock Scaffolding type scaffold systems.
3. Created from the highest quality steel tubing (A513 or Q345)
4. Quality Assured from the factory all the way to your project job site, will get the job done safely and efficiently.

Description of Double Ledger

Product Type RINGLOCK DOUBLE LEDGER
Length 2440mm
Surface Finished Electro-Galvanized/Hot Dip Galvanized/Powder Coated
Material Q235
Package In bulk or Steel Pallet, as your request, OEM accepted
Payment Terms TT/LC
Delivery Terms FOB; CIF; CNF
Loading Port QINGDAO
Delivery time 25--30 days after receiving pre-payment
Product Capacity 50 tons per day
MOQ 10 tons
Leave a Message Email Us

we will contact you within 24 hours.

  • TEL:0086-18653976938
  • FAX:+86 0539 2800891
  • EMAIL:info@lyqueen.com
  • ADDRESS:IEC 1711-1712 Shanghai Road, Lanshan District, Linyi City, Shandong Province, China